The date at which to stop the schedule.
You can specify the date and time in one of the following formats:
YYYY-SHORTMONTH-DD HH:NN:SS
. Controller interprets the time as UTC.#ISODATETIME
. An ISO-8601 date, optionally with a time. This format accepts the format YYYY-MM-DDTHH:NN:SS.FFFFZ
. YYYY-MM-DD
is always required, but this format accepts the following variations:
T
or a space, or you can omit the separator between date and time. If you use the T
separator, it must have a valid time after it.Z
, ±HH
, ±HHMM
, or ±HH:MM
.YYYYMMDDHHMMSS
, but not YYYYMMDDHH:MM:SS
or YYYY-MM-DDHHMMSS
).You can also set ScheduleCount to specify the number of times a schedule should run.
Actions: | AddSchedule EditSchedule |
Type: | String |
Default: | None |
Required: | No |
Example: | ScheduleEnd=2014-Jun-30 00:00:01
|
See Also: | ScheduleCount |